“The Makeover of a Leftover”

The story behind the IGA office building RoundtheCorner

It all started when IGA decided to move their offices and found an opportunity to rescue an old, torn down building in the Mar Mikhael Neighbourhood of Beirut City.

IGA_image03.jpg

“Saving Private …Building” project was launched.

With the growing real estate pressure & lack of interest in the spreading soulless fancy towers & posh neighbourhoods; the hunt for a last bastion with an authentic character in Ashrafieh’s outskirts began.

The Target: a land with serious issues; undesired by developers. The low budget operation “Saving Private Building” triggered the converted architecture & up cycling concepts.

110000a.jpg

First Design Attempt

Aiming for an ecological approach, our first design integrated most of the green technologies in terms of energy savings, waste reduction, water management, and material selection. We also tried to increase the total area by 40% which had an impact on the structure.

IMG_1393.JPG

Design Evolution

As our philosophy evolved we wanted to achieve more savings so we did a completely different design this time we didn’t increase the area we simply worked on maximising the use of the existing spaces we focused on making the spaces more flexible in order to accommodate different activities.

For example…

We can turn our office space into a reception area, into a reception area or an exhibition space or again an apartment 

991- GF scenario 1.jpg
991- GF scenario 3.jpg
991- GF scenario 4.jpg

Visit Us

IGA Premises,

Qobayat Street,

Mar-Mikhael, Beirut, Lebanon

Contact Us

contact@imadgemayel.com

00 961 1 44 88 44